Welcome to Team Kika Mana's Official Site! #368 Tiger Power!



Week 6 Summary:
The end of the Build Season came closer as we progressed through Week Six. The team went into crunch time mode as we programmed, wired, and assembled the robot. The mechanical team continued to be productive by fabricating several metal parts in the machine shop. The electrical team focused on doing lots of wiring for the robot. On the last build day, the whole team persevered until the very end. The robot was bagged and another successful build season came to a close.