Over the span of week four, the mechanical subgroup continued to machine and design parts. A few things they have done are create bearings and bumpers.
The electrical subgroup prolonged line tracking and adding limelight to swerve code. They have added crosshair calibrating with the limelight and PID to their tasks. Electrical is still testing on the past 2017 robot.